Hitachi Rail

DMA has been working with Hitachi since Summer 2013 completing their PPM to mechanical plant

  • Hitachi Rail Depot in Ashford is the first rail vehicle maintenance centre built in Europe by the company, and is responsible for all maintenance of trains running between London and the Channel Tunnel.
  • Hitachi have been a client of DMA’s since Summer 2013.
  • Our mobile team complete the PPM maintenance to mechanical plant including boilers, water heaters and sanitary ware servicing, and electrical servicing including emergency lights.
  • DMA also manage a variety of specialist sub-contractors servicing, such as RPZ valves, gutter clearance and drain maintenance.
  • Recent small works on site include replacement water heaters throughout the building, installing new LED lighting and power supplies, and installing new toilet systems to all buildings.
  • We complete an annual shut down with Hitachi staff in order to fully service the distribution boards. We also ensure that the boiler plant is in full working order and work alongside other contractors to ensure that all critical plant is up and running once the shut down is complete.
  • 24/7/365 emergency call out response.
View All Case Studies